Altro Whiterock Installation 1: Site requirements

In the first part of our Altro Whiterock installation series, we run through the site requirements needed for an optimum Altro Whiterock installation.
  • Altro Whiterock Installation 1: Site requirements

  • Altro Whiterock Installation 10: Hot welded joint

  • Altro Whiterock Installation 11: Altro Whiterock Flexijoint

  • Altro Whiterock Installation 2: Workstation

  • Altro Whiterock Installation 3: Setting out

  • Altro Whiterock Installation 4: Application tape

  • Altro Whiterock Installation 6: Adhesives

  • Altro Whiterock Installation 7: Fitting the sheet

  • Altro Whiterock Installation 8: Thermoforming

  • Altro Whiterock Installation 9: Finishing details

  • How to guide - Installing Altro Ensemble

  • How to guide - Access cover

  • How to guide - Applying adhesive

  • How to guide - Applying DPM

  • How to guide - Capping and coving

  • How to guide - Cutting internal and external mitres

  • How to guide - Drain outlet

  • How to guide - Finish door architrave

  • How to guide - Installing adhesive free floors

  • How to guide - Installing Altro Everlay

  • How to guide - Installing and welding an alternative mitre

  • How to guide - Installing the floor

  • How to guide - Welding internal and external mitres